InnoTech Core

The current Systems are too old

All Jumpforms systems use:

  •  Extensive Labour on site with exclusion zone to lift the individual beams and build it on site.
  •  10 to 12 men to adjust the shutters, join the individual members to form the jumpform.
  • Connects a massive tower to the core if the concrete boom will be placed at the top.
  • Uses hydraulic rams with pockets that require patching Later

Key differentiators

  • Stronger

    30-ton jack capacity with higher capacity platforms

  • Crane Independent

    InnoTechCore climbs Automatically With the boom on top.

  • Power Efficient

    InnoTechCore with 12 jacks only Requires 32 amps from site.

  • Wireless

    InnoTechCore has a wireless Connection to the office for remote troubleshooting

Environmental benefits

  • Less Emissions

    - Using InnoTechCore reduces heavy machinery from site wich reduces emissions from diesel cranage - Reducing labour numbers on site reduces waste and travel to site

  • Sustainability

    -InnoTechCore recycles all materials from one job to the other reducing waste