InnoTech Core
The current Systems are too old
All Jumpforms systems use:
- Extensive Labour on site with exclusion zone to lift the individual beams and build it on site.
- 10 to 12 men to adjust the shutters, join the individual members to form the jumpform.
- Connects a massive tower to the core if the concrete boom will be placed at the top.
- Uses hydraulic rams with pockets that require patching Later
Key differentiators
Fast Cycle Time
InnoTechCore climbs one floor up to 4m in 25 minutes.
Cost Savings
up to 40% less cost in operation
Stronger
30-ton jack capacity with higher capacity platforms
Crane Independent
InnoTechCore climbs Automatically With the boom on top.
Power Efficient
InnoTechCore with 12 jacks only Requires 32 amps from site.
Wireless
InnoTechCore has a wireless Connection to the office for remote troubleshooting
Environmental benefits
Less Emissions
- Using InnoTechCore reduces heavy machinery from site wich reduces emissions from diesel cranage - Reducing labour numbers on site reduces waste and travel to site
Sustainability
-InnoTechCore recycles all materials from one job to the other reducing waste